SRV-04.02 Facade Cost Breakdown

Breaking down and determining the unit cost per facade, the design team is able to work on a value-based facade designed from the beginning, with no need of continuous redesign and value engineering.
Breaking down and determining the unit cost per facade, the design team is able to work on a value-based facade designed from the beginning, with no need of continuous redesign and value engineering.